North Africa’s Energy Bets Take Shape

Algeria Holds the Line

Actual output sits close to the target. OPEC’s estimate for September was 1.003 million barrels per day, while an EIA-based series puts it at 0.98 million. Either way, it is well below the record monthly high of 1.408 million reached in April 2008. 

The wider market explains why those barrels matter. OPEC+ has been raising targets through 2026, but the Middle East conflict and disrupted exports through the Strait of Hormuz have kept much of the planned increase from materialising. A producer that delivers its quota reliably is worth more in that climate.

A Pipeline Across the Sahara

The Trans-Saharan gas pipeline is the long game. Proposed in the 1970s, it was backed by a 2009 intergovernmental agreement and then stalled. A 2006 study by Penspen found it technically and economically feasible.

This year it moved. On 4 June, after the fifth ministerial meeting of the steering committee in Algiers, Algerian Energy Minister Mohamed Arkab joined Nigerian and Nigerien officials at a ceremony in Adrar Province to mark the start of construction on the Algerian segment. The line is 4,128 kilometres long and designed to carry up to 30 billion cubic metres a year from Nigeria, through Niger, to Algeria. It is being developed by Sonatrach, the Nigerian National Petroleum Company and Niger’s SONIDEP. Algeria’s President has confirmed that Sonatrach will finance and build Niger’s section, and work in Niger is expected to start in early 2027.

The commercial logic is straightforward. Algeria exported 54 billion cubic metres of gas in 2021, mainly to Italy and Spain, and Nigerian gas would add to what those routes carry.

The hard parts remain. The Rio Times reports the project has no first-gas date, and as of 2 November Algeria was sending troops to Niger to protect energy installations. It also describes the roughly $13 billion route as lacking a confirmed financing plan and named buyers. One analysis argues the project’s fate depends on securing a transit corridor through Niger, not on European demand.

Libya’s Modest but Useful Find

On 16 September, OMV and Libya’s National Oil Corporation confirmed the commercial viability of the Essar discovery in the Sirte Basin, with estimated gross recoverable resources of up to 45 million barrels. The field is expected to reach gross production capacity of about 6,000 barrels per day once fully developed.

OMV operates the well and holds 12% of concession C 103, and Zueitina Oil Company will lead development. Because the site sits close to existing production and processing infrastructure, the partners expect quick development.

For OMV the find carries weight. C103 marked its return to Libyan exploration in 2024 after a ten-year break, and Libya contributed 12.9 million barrels to its 2025 production, its highest level there.

The scale is small next to Libya’s output, which stands around 1.4 million barrels per day, the highest since 2013. Location is the point. The Sirte Basin holds about 80% of Libya’s proven oil reserves and accounts for 90% of its output. The NOC is also signing production sharing agreements with Repsol and TPAO, and with Eni, QatarEnergy and MOL, so Essar is one deal among several.

What Connects Them

None of this is a sudden jump in supply. Algeria offers discipline and a route to Europe, while Libya offers barrels close to infrastructure that already works. Four things will test the story. The first is the OPEC+ meeting on 29 November. The second is whether Niger’s section starts on schedule. The third is whether the pipeline gets financing and buyers. The fourth is how quickly Essar reaches its 6,000 barrels a day.

 

Written by:

*Sesona Mdlokovana

Associate at BRICS+ Consulting Group

Africa Specialist

**The views expressed do not necessarily reflect the views of IOL.

** MORE ARTICLES ON OUR WEBSITE https://bricscg.com/ 

** Follow @brics_daily

Related Posts